The urban landscape of Lima and Callao, long characterized by its challenging topography and fragmented public transit system, is poised for a revolutionary shift. The Autoridad de Transporte Urbano para Lima y Callao (ATU) has unveiled an ambitious master plan to integrate the city’s isolated hillside communities with the metropolitan transport grid. The centerpiece of this vision is the implementation of a comprehensive network of eight aerial cable car systems, spanning a total of 46.8 kilometers and designed to fundamentally reshape how nearly one million citizens navigate the Peruvian capital.
Main Facts: Bridging the Divide
The proposed cable car network is not merely an aesthetic addition to the city’s infrastructure; it is a strategic logistical necessity. As part of the broader "Urban Mobility Plan 2025-2045," the ATU has identified cable cars as the most efficient, cost-effective, and environmentally sustainable solution for connecting neighborhoods located on steep inclines—areas where traditional bus routes and rail lines are geographically impossible to construct.
By creating direct aerial links between these high-altitude residential pockets and major transit hubs like the Lima Metro (Lines 1 and 3) and the Metropolitano, the ATU aims to reduce commute times from hours to minutes. The project targets the inclusion of over 950,000 residents who currently rely on informal transport, long walks, or expensive, unreliable vehicle services to reach the city’s economic centers.
Chronology: A Multi-Decade Transformation
The project is a core pillar of the 20-year Urban Mobility Plan (PMU) for 2025–2045. The timeline for this infrastructure overhaul is structured to allow for phased implementation, ensuring that financial resources and engineering expertise are synchronized with the city’s most urgent needs.

- 2025-2028: The Foundation Phase. Initial feasibility studies, environmental impact assessments, and the procurement processes for the first set of cable car lines.
- 2029-2035: Execution and Integration. Construction of the high-priority links, such as the San Martín de Porres–San Juan de Lurigancho line, begins. These projects are scheduled to coincide with the expansion of the Metro lines to ensure seamless intermodal connectivity.
- 2036-2045: Scaling and Maturity. The final phases of the network will expand into the southern and northern peripheries of the city, culminating in a fully integrated system that links suburban peripheries with the urban core.
Supporting Data: Mapping the Connections
The efficacy of the proposed network lies in its specific, data-driven connectivity nodes. The following table outlines the key components of the 46.8 km project:
Priority Infrastructure Projects
- San Martín de Porres – San Juan de Lurigancho (6 km): A critical link connecting the Tomás Valle station (Metropolitano/Metro Line 3) with the Los Jardines station (Metro Line 1). It is expected to benefit 173,000 residents.
- Lurigancho – San Juan de Lurigancho (7.4 km): Designed to serve 126,000 people, this route addresses one of the most densely populated eastern sectors of the city.
- Lurigancho Local Line (3.9 km): A strategic feeder route providing access for 50,000 residents to the wider transit grid.
- La Victoria – El Agustino (1.5 km): Despite its shorter length, this high-density connection will serve 105,000 citizens, bypassing the congestion of the valley floor.
- Villa María del Triunfo – Pachacámac (Two segments: 3.2 km and 7.8 km): These combined lines will provide vital connectivity for 145,000 residents, including the burgeoning Manchay area.
- Comas – San Juan de Lurigancho (8 km): A massive project targeting 226,000 beneficiaries, linking northern and eastern Lima.
- Ventanilla – Puente Piedra (8.9 km): Extending the reach of the system to the northwestern corridor, impacting 124,000 residents.
Official Perspectives: The Vision for Urban Mobility
The ATU, in conjunction with urban planning experts, emphasizes that the success of this project hinges on "Intermodality." The goal is not to have isolated cable car stations, but to ensure that every terminal acts as a gateway to the wider city.
"We are not just moving people; we are moving opportunities," an ATU representative noted during the announcement. The plan integrates these aerial systems into a larger framework that includes seven additional Metro lines, 42 kilometers of high-capacity Bus Rapid Transit (BRT), 113 kilometers of medium-capacity BRT, and a massive expansion of standard bus corridors totaling 878 kilometers.
The administration argues that the social impact of these cable cars extends beyond time-savings. By connecting isolated populations to the central labor market, the government expects a surge in local economic productivity, reduced carbon emissions from the replacement of informal, old-model combustion vehicles, and a general improvement in the quality of life for the city’s most vulnerable populations.

Socio-Economic and Environmental Implications
The implications of the 2025-2045 plan are profound. Traditionally, urban development in Lima has followed a "bottom-up" pattern, where informal settlements expand into dangerous, steep areas without municipal planning. The cable car network represents a "top-down" intervention intended to reclaim these areas, providing the safety, dignity, and connectivity that these citizens have lacked for decades.
1. The Ecotourism Opportunity
Beyond basic transit, the project identifies potential for cultural and environmental preservation. Many of the proposed cable car routes pass near historical sites, protected wetlands, and the fragile but beautiful lomas (hills) that ring the city. The ATU suggests that these systems could serve as eco-transport, allowing citizens and tourists to access natural landmarks without the need for road infrastructure that would otherwise destroy the landscape.
2. Economic Catalyst
The stations will likely become hubs for small-scale commerce. As foot traffic increases at these nodes, local businesses, services, and public spaces (parks, clinics, libraries) are expected to emerge, turning transit terminals into mini-centers of community activity.
3. Safety and Security
The integration of these areas into the formal transit network brings with it improved lighting, surveillance, and police presence, which are typically installed at transit stations. This "formalization" of transit routes acts as a deterrent to crime and provides a safer environment for workers returning home late at night.

Conclusion: A City Redefined
The proposal to build eight cable car lines in Lima is arguably one of the most ambitious social engineering projects in Latin America for the next two decades. While the scale of the investment is significant, the cost of inaction—continued traffic congestion, social isolation, and extreme inequality in mobility—is far higher.
As Lima moves toward 2045, the sight of cable cars traversing the city’s skyline will symbolize a new era. It represents a shift from a city that is divided by its geography to one that is united by its infrastructure. By prioritizing the residents of the hillsides, the ATU is not merely building a transport network; it is building a bridge to a more integrated, equitable, and efficient future for one of South America’s most dynamic capitals.
With the master plan now clearly defined, the focus must shift to the rigorous process of securing international investment, ensuring transparent bidding, and maintaining the highest standards of engineering to ensure that this vision becomes a reality for the millions waiting for the city to finally reach them.
